Wednesday Jul 17, 2024
Episode 4 - Borumba Transmission Connection Project - voltage change
In this episode we talk about the change in voltage for the transmission lines that will connect the proposed Borumba Pumped Hydro Facility to the electricity grid and what that means for landholders and the community.
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.